Jump to content

Broken Views - Aligning Break Lines (CAXA)


Malcolm Crowe

Recommended Posts

There are two methods that we use when we want to create multiple Broken Views in CAXA with aligned break lines.

1. Generate the first view and use "Broken View" to add the desired break lines. Then create the additional broken views from this first broken view using "Projection View". This is very simple, provided that you know in advance that the views will be broken.

2. When we have existing views in place, that we then need to break, we first draw a guide box across both views, to define where the break lines will be. Then we break each view, selecting the corners of the guide box to ensure that the break lines of both views are aligned. When complete, we then delete the guide box.

Attached is a video demonstrating both methods.

Malcolm

Broken Views - Aligning Break Lines.PNG

Edited by Malcolm Crowe
  • Like 1
Link to comment
Share on other sites

  • Malcolm Crowe changed the title to Broken Views - Aligning Break Lines (CAXA)

Join the conversation

You are posting as a guest. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...