Jump to content

bbuche

Community Members
  • Posts

    683
  • Joined

  • Last visited

Posts posted by bbuche

  1. ok I attached a 2-d shape to my original part and made an assembly and it works great now the one problem I have is all my smart snaps went away because they were on the original part and now it is an assembly. Do I now need to transfer all those smart snaps at the assembly level?

     

     

    thanks

    B-

  2. so what do I tell our 30 dealers that want to upgrade? Dont because things might be fixed sometime in the next 3 months.... what about the supressed items what about the back up files, I am sorry that I am going off here but this is kind of the standard thing that goes on here every new version of IC. Put out a new release that probably should have not come out and then have to wait for a pu1 to actually start using the program......

  3. Happy new year to all. I was wondering when a hot fix will be available. It is the new year and the only thing stopping us from truly upgrading is a couple of minor things to be fixed with IC. Main items are the custom bom's and the fact that settings are not sticking. See bug reports for more detailed explanations.

     

    Thanks and happy new year

  4. ok I have a problem and wondering if the community has a solution for me. We have a product line called truss that you can connect 1 stick to another stick of this product. To connect these two pieces there are connectors. To save time we do not draw these connectors and since they are inside of the stick they are never seen.

     

    Ok so my problem is, is there a way to attach a secondary part info to a part so I can compute the connectors that go along with each stick of truss? I tried attaching a 2d shape and giving it my part info for the connector and it does not compute right on the BOM

     

    Any help would be greatly appreciated thanks

     

    B-

  5. that makes sense then, I think Jan quoted our guy 3,000 for the floating. I was just looking into it so I didnt have to make the one guy that has it on his machine do all my work but I think we will just stick with that for now.

     

    Thanks Cary

  6. do you think the project would be a large cost or a partnership. I just dont see my company spending money right now. Benefit huge to us but dont see them doing it but I can pitch it to them

  7. My work is trying to get the most out of our bom info but it is not complete enough. My question is..... we have a part that includes connectors, the part and connectors have 2 seperate part numbers. We draw the main part and do not draw the connectors because they are always hidden. Is there a way to attach info to a part (the main part) to include a line for the connectors? I hope this makes sense if not I will try and explain better.

     

    Thanks for the help

     

    Brian

  8. (electing a decent president was a first step in the right direction, I think)

     

     

    wow you thinks so..... the guy is going to rob peter to pay paul but dont want to make this a political debate so lets go pump some cad!

×
×
  • Create New...